SITE: CONGO
The thermoelectric power plant in Djeno, near
Point Noir in Congo, has a 25 megawatts
power capacity. The power plant is fired with
associated gas from the offshore plants of
Kitina, Djambala and Foukanda, located 65
km from the coast and producing a total of
26,000 barrels of oil per day. Gas is separated
onshore at the Djeno terminal close to the
new power plant.
The project represents the
first example of use and exploitation of
associated gas otherwise flared.
The project aims at reducing gas flaring and
at using it in power generation with significant
social, economic and environmental benefits.
EPC contractor
Renco

End User
Eni Congo

SOLUTIONS DELIVERED
Skema was responsible for the design, manufacturing, supply, inspection, testing, export packing, supervision of commissioning on site of:
• Power Centers (7 columns)
• Motor Control Centers (12 columns)
• Auxiliary services switchboards
Delivery time: 10 weeks
|