SITE: KAZAKHSTAN
Chinarevskoye Field, approximately 324
square kilometres in size, is situated close
to the city of Uralsk in West Kazakhstan and
is only 60 km from the border with the Russian
Federation. The field consists in an oil
processing facility capable of processing
400,000 tpa of crude oil, multiple oil gathering
and transportation lines, a gas powered
electricity generation system, major warehouse
facilities for the storage of oil, materials,
machinery and chemicals used in crude oil
production, an employee field camp for 180
people as well as 14 existing wells and 4
exploration wells under drilling and test
operations.
EPC contractor
Exterran/Belleli Energy

End User
ZhaiknMunai LLP

SOLUTIONS DELIVERED
Skema supply included the design, manufacturing, testing and supply of:
• 6 kV MV switchboards (31 sections)
• Intelligent Power Motor Control Centers, including:
- 55 Intelligent Motor Control Centers (240 drawers)
- 20 Power Centers
• Capacitors panels
Delivery time: 18 weeks
|